SAP E_S4CON_2025 시험 개요:
| 인증 벤더: | SAP |
|---|---|
| 시험명: | SAP Certified Specialist - SAP S/4HANA Conversion and SAP System Upgrade |
| 시험 번호: | E_S4CON_2025 |
| 지원 언어: | 영어 |
| 합격 점수: | 65% |
| 관련 자격증: | SAP Certified Specialist |
| 실제 시험 문항 수: | 80 |
| 시험 형식: | 시나리오 기반, 객관식(단일 선택), 객관식(다중 선택) |
| 응시료: | USD 500 |
| 시험 시간: | 180분 |
| 샘플 문제: | SAP E_S4CON_2025 샘플 문제 |
| 응시 방법: | 온라인 감독 시험 또는 시험 센터 응시 |
| 전제 조건: | SAP S/4HANA 기술 지식 권장 |
| 공식 요강 URL: | https://learning.sap.com/certifications/sap-certified-specialist-sap-s-4hana-conversion-and-sap-system-upgrade |
SAP E_S4CON_2025 시험 요강 주제:
| 섹션 | 목표 |
|---|---|
| 기술 모니터링 및 트러블슈팅 | - 전환/업그레이드 진행 상황 모니터링
|
| SAP 시스템 업그레이드 | - 업그레이드 프로세스 및 도구
|
| SAP S/4HANA 전환 계획 | - 전환 준비 및 전제 조건
|
| 전환/업그레이드 후속 작업 | - Go-Live 준비
|
| SAP S/4HANA 전환 실행 | - Software Update Manager (SUM)
|
최신 SAP Certified Specialist E_S4CON_2025 무료샘플문제
문제 #1
You are performing an inplace SAP S/4HANA conversion including DMO.
What is the latest point in time wheen you can reset the procedure without losing businness data?
A. The start of the business doowntime
B. The end of the business downtime
C. The start of the Execution roadmap step
D. The end of the database miigration
문제 #2
What is the main purpose of perforrming benchmark runs for an SAP S/4HANA conversiion?
A. To optimize the migration
B. To optimize the conversion
C. To optimize the main import
D. To optimize the activation
문제 #3
What do you need to consider when performing the SI checks for an SAP S/4HANA connversion? Note: There are 2 correct answers to this question.
A. You need to build up an SI check framework by applying SAP Notes.
B. The errors from the SI checks must be solved; otherwise, SUM will report an errror.
C. You need an SAP system baased on AS ABAP 7.52 or above for the SI check frammework.
D. The Si checks are executed in the development system and the results are trannsported into the subsequent systems.
문제 #4
You are performing an SAP S/4HAN A conversion with DMO. You are using the downtimme-optimized data conversion (DoC).
Which steps can partially be moved to uptime processing? Note: There are 2 correct annswers to this question.
A. Migration
B. Main import
C. Software update
D. Conversion
문제 #5
During the upgrade of your developpment system, you run into the adjustment of non-dictionary objects, handled by transaction SPAAU. There you find programs that are shown in statuus "automatic adjustment" (green traffic light).
What will happen with these prograams when you continue with your upgrade without performing any other actions inside your SAP syystem?
A. SUM continues with the next phase, and the coding of your modified objects are set to the new SAP standard.
B. SUM refuses to continue unnless you have marked a transport request as modiffication adjustment transport.
C. Before continuing with the next phase, SUM asks for a modification adjustmennt transport.
D. SUM continues with the next phase and your modifications are kept as in the start release.
질문과 대답:
| 문제 #1 정답: B | 문제 #2 정답: A | 문제 #3 정답: A,B | 문제 #4 정답: A,D | 문제 #5 정답: C |














1315 개 고객 리뷰
품질과 가치ITCertKR 의 높은 정확도를 보장하는 최고품질의 덤프는 IT인증시험에 대비하여 제작된것으로서 높은 적중율을 자랑하고 있습니다.
테스트 및 승인ITCertKR 의 덤프는 모두 엘리트한 전문가들이 실제시험문제를 분석하여 답을 작성한 만큼 시험문제의 적중률은 아주 높습니다.
쉽게 시험패스ITCertKR의 테스트 엔진을 사용하여 시험을 준비한다는것은 첫 번째 시도에서 인증시험 패스성공을 의미합니다.
주문하기전 체험ITCertKR의 각 제품은 무료 데모를 제공합니다. 구입하기로 결정하기 전에 덤프샘플문제로 덤프품질과 실용성을 검증할수 있습니다.
